Deviation From Exercise:
Reduce Temperature Drop Rate During Stage I:
Reduce Temperature Drop Rate During Stages II & III:
Close One Nozzle in Cargo Tanks Below 0°C:
Start LD Compressors:
|
Alarm Condition |
Alarm Time | Alarm Level | Alarm Title | Alarm Description |
Action |
|
When prerequisite milestones for starting the cooldown are completed. |
Before Starting Cooldown | Remark | Begin the cooldown process with a low flow rate. |
Begin the cooldown with a low flow of 25 m³/h. |
|
|
Tank Middle Temp <= 5°C |
When particular tank middle sensor temperature reaches 5°C | Remark | Reduce Master Valve Opening In CT 1,2,3,4 |
Reduce the master valve opening to at least 25% For CT1 and 50% For CT2,CT3,CT4. |
|
|
Valve not closed to required percentage, after receiving the remark |
After 1 minute of receiving the remark alarm | Caution | Reduce Master Valve Opening In CT 1,2,3,4 |
Reduce the master valve opening to at least 25% For CT1 and 50% For CT2,CT3,CT4. |
|
|
Tank Middle Temp <= 0°C |
When particular tank middle sensor temperature reaches 0°C | Remark | Close One Nozzle In CT 1,2,3,4. |
Close one spray nozzle in cargo tank 1 and continue cooldown. |
|
|
One Nozzle Not Closed After Receiving the Remark(And Action Not Taken). |
5 minutes after receiving the remark | Low Priority | Close One Nozzle In CT 1,2,3,4. |
Close one spray nozzle in cargo tank 1 and continue cooldown. |
|
|
One Nozzle Not Closed After Receiving the low priority (And Action Not Taken). |
5 minutes after receiving the low priority | High Priority | Close One Nozzle In CT 1,2,3,4. |
Close one spray nozzle in cargo tank 1 and continue cooldown. |
|
|
whenever temperature drop exceeds the max level. |
Whenever the drop is more than -17°C during stage 1 or 11°C during stage 2. | Caution | High Temperature drop in CT1,2,3,4. |
High temperature drop in CT1,2,3,4, Adjust master valve CS103,203,303,403 or reduce the flow from shore. |
|
|
Cargo Tank Pressure >= 14 kpa |
Caution | Start LD Compressor | High pressure inside the tanks, start the LD compressor. | ||
|
Cargo Tank Pressure >= 16 Kpa |
Caution | Start Another LD
Compressor |
Start another LD compressor. |
Preparing Generators for Use:
Open all required valves for the line-up.
|
Valve |
Status/Position |
|
CS401 |
Open |
|
CS701 |
Open |
|
CS700 |
Open |
|
CS103 |
25% |
|
CS107 |
Open |
|
CS108 |
Open |
|
CS203 |
50% |
|
CS207 |
Open |
|
CS208 |
Open |
|
CS303 |
50% |
|
CS307 |
Open |
|
CS308 |
Open |
|
CS320 |
Open |
|
CG100 |
Open |
|
CG101 |
Open |
|
CG200 |
Open |
|
CG201 |
Open |
|
CG300 |
Open |
|
CG301 |
Open |
|
CG400 |
Open |
|
CG401 |
Open |
|
CG901 |
Open |
|
CG902 |
Open |
|
CG914 |
Open |
|
CG913 |
Open |
|
CG940 |
Open |
|
CG9105 |
100% |
|
CG9106 |
100% |
Test Run GCU:
Start Spray Pump in Cargo Tank 4:
Cooldown Process:
Completion: