| Alarm Condition | Alarm Time | Alarm Level | Alarm Title | Alarm Description | Actions |
| Tank Level 1.5 m | Remark | Run Spary Pump | Cargo tank 1,2,3,4, volume reached 1.5 m run spray pump in recirculation mode. | Fails if the pump is not running in recirculation and level reaches 1m | |
| pressure >= 4.5 | Low | High Cross Over Pressure | High cross over pressure in liquid line, reduce pump’s flowrate. | ||
| pressure >= 5 | High | High Cross Over Pressure | High cross over pressure in liquid line, reduce pump’s flowrate. | Fails if the pressure >= 5 for 1 minute. | |
| Tank Level 0.8 m and both pumps running | Caution | Throttle Discharge Valve CL201,CL202…etc | throttle discharge valve CL201 to stabilize the pump. | ||
| Tank Level 0.65 m and both pumps running | Caution | Stop One Cargo Pump In CT2 | Turn off one of the cargo pumps for safety. | If fails one pump will trip at level 0.6m | |
| Tank Level 0.8 m and both pumps running or Tank Level 0.350 m with single pump running. | low | Low Current | low current, adjust the discharge valve to make the pump stable. | ||
| Tank Level 0.60 m and both pumps running | High | Cargo Pump 2 in CT2 Tripped | Cargo Pump ct2_cargo_pump2 Tripped for Safety, Close discharge valve CL202. | If more than 2 pump tripped exercisre will be terminated. | |
| Tank Level 0.18 m and pumps running | High | Cargo Pump 1 in CT2 Tripped | Cargo pump ct2_cargo_pump1 tripped due to tank reached low level, Close discharge valve CL201. | If more than 2 pump tripped exercisre will be terminated. | |
| when un necessary valve opened or required valve closed | Caution | Deviation Detected | Deviation from the exercise is detected, undo your last action. | Fails if that valve is not closed or opened within 1 minute | |
| When all cargo pumps are stopped. | Remark | Start Line Draining | Close double shut valves and open return valve in CT4 to start line draining | ||
| When Double Shut Valves Closed And CL400 Opened. | Remark | Line Draining Started | Line draining has started, liquid filling into CT4. |
Step By Step Procedure
Steps to Start the Spray Pump:
Tank-Specific Valve Details:
| Tank | Discharge Valve | Return/Filling Valve | Master Valve |
| Tank 1 | CS101 | CS100 | CS103 |
| Tank 2 | CS201 | CS200 | CS203 |
| Tank 3 | CS301 | CS300 | CS303 |
| Tank 4 | CS401 | CS400 | CS403 |