Milestones:
- Learning and Training Phase – Pre-Requisites for the start of operation:
- Open Required Valves for Line Up
- Prepare Required Generators for Use
- Assessment Phase – Operational flow and Assessment:
- Start Spray Pump in Cargo Tank 4
- Stop Spray Pump in Cargo Tank 4
- Achieve Required Temperatures on Liquid Header
Actions During Exercise:
Deviation from Exercise:
- After starting or resuming the line cooldown, do not open any non-required valves or close any required valves.
- A caution message will prompt the user to undo the last action.
- Failure to correct this will terminate the exercise.
High Crossover Pressure:
- During line cooldown, if crossover pressure reaches 4 bar, the user will be prompted to open valve CL400 to reduce the pressure.
- If the pressure reaches 5 bar and CL400 has not been opened, the exercise will terminate.
Liquid Entering the Tank:
- When CL400 is opened (max 10%) to reduce crossover pressure, liquid will start entering the tank.
- The user will receive a warning to close CL400. If this is not done within 1 minute, the exercise will terminate.
Close Tank Filling Valves CL200, CL300, CL400:
- At 3 minutes into the exercise, the user must close CL200, CL300, and CL400. Failure to do so will terminate the exercise.
Keep Tank Filling Valves CL100 and CL400 Open:
- At the 12-minute mark, the user will be warned to keep CL100 and CL400 open. Failure to keep these valves open will cause the exercise to terminate.
Alarms & Remarks
| Alarm Condition |
Alarm Time |
Alarm Level |
Alarm Title |
Alarm Description |
Actions |
|
|
remark |
Started Line Cooldown |
Started cooling the liquid lines. |
|
|
|
caution |
Open Filling Valves |
Keep the filling valves CL100 and CL400 open. |
|
|
|
remark |
Increase Spray Pump Flowrate |
Increase and maintain spray pump flow rate between 50 to 55. |
|
|
|
caution |
Close Tank Filling Valves |
Close the filling valves CL200, CL300, and CL400. |
|
|
|
caution |
Close All Filling Valves |
Close filling valves CL100 and CL400. |
|
|
|
remark |
Line Cooldown Completed |
The spray pump can be stopped. |
|
|
|
caution |
Open Cargo Tank 4 Valves |
Keep valves CS400 and CS404 open. |
|
|
|
caution |
High Cross Over Pressure |
High cross over pressure in liquid lines, open filling valve CL400. |
|
|
|
caution |
Close Valve CL400 |
Close filling valve CL400 to fill up the liquid line. |
|
|
|
caution |
Deviation Detected |
Deviation from the exercise is detected, undo your last action. |
|
Step By Step Procedure
- Learning and Training Phase – Pre-Requisites for the start of operation:
Open All Required Valves for Line-Up:
- CG100 – Open
- CG101 – Open
- CG200 – Open
- CG201 – Open
- CG300 – Open
- CG301 – Open
- CG400 – Open
- CG401 – Open
- CG075 – Open
- CG701 – Open
- CG702 – Close & Auto
- CS704 – Open
- CS705 – Open
- CS706 – Open
- CS707 – Open
- CS071 – Open
- CS072 – Open
- CS700 – Open
- CS701 – Open
- CL107 – 100%
- CL207 – 100%
- CL307 – 100%
- CL407 – 100%
- CL100 – 100%
- CL200 – 100%
- CL300 – 100%
- CL400 – 100%
- CS401 – Between 25% and 30%
- CS403 – 100%
Prepare Required Generators for Use:
- Navigate to the PMS page through the side navigation or click on the “number of generators running” indicator on the Cargo Tank 4 page.
- Turn on one of the three generators not currently running. (One generator is already running by default.)
- Assessment Phase – Operational flow and Assessment:
Start the Spray Pump in Cargo Tank 4:
- Open Valve CS401 to 25-30%.
- Open Valve CS400 to 95% or greater.
- Ensure two or more generators are running (one is default).
- Close CS403 (Spray Pump Master Valve) to 5% or less.
- Once these conditions are met, start the spray pump.
Starting the Line Cooldown:
- After lineup and starting the spray pump, open Master Valve CS403 to 100%.
- Close Return Valve CS400 to 0%.
- Once these actions are completed, the cooldown process begins, and a remark will be issued.
Actions at the 3-Minute Mark:
- At the 3-minute mark, the user will be warned to close CL200, CL300, and CL400.
- Once closed, the tank pressure will decrease by 0.3 kPa per minute, while crossover pressure will increase from 2 to 5 bar.
Managing Crossover Pressure at 4 Bar:
- When crossover pressure reaches 4 bar, the user must open CL400 for 20 seconds to reduce the pressure.
- Failure to open CL400 will result in exercise termination once pressure reaches 5 bar.
Pressure Management:
- After closing CL400, the crossover pressure will rise again. If it reaches 4 bar, repeat the process of opening CL400 for 20 seconds.
Actions at the 12-Minute Mark:
- At the 12-minute mark, keep CL100 and CL400 open.
- Crossover pressure will be maintained at 2 bar while tank pressure increases by 0.3 kPa every minute.
At the 14-Minute Mark:
- The user will be warned to stop the spray pump in Cargo Tank 4.
- Navigate to the Cargo Tank 4 page to stop the pump.
- After stopping the pump, the user will be prompted to close the filling valves in all tanks.
Completion of the Exercise:
- After closing the filling valves, open CS400 and CS404.
- The exercise is complete once the liquid header forward temperature reaches -120°C, the spray pump is stopped, and the required valves are opened.
Proper line up for line cooldown at sea: